After the ground loop is installed, pressure tested and inspected by the town, the installer can start installing gear.

I decided to have the compressor portion installed in the garage, close to the water heater.  I purchased the desuperheater option to heat the hot water with the excess geothermal heat.

Here is a picture of the ground loop connection and the circulation pumps that push the water through the ground loop:

Untitled

The next part is to connect the compressor unit to the loop, and run the new refrigerant lines up to the attic for the blower unit:


Untitled

Then you go into the attic, and turn off the AC until the rest is completed!